Transform Your Huntington Property: The Complete Guide to Cesspool Conversion Timelines and Advanced Treatment Systems
Huntington homeowners face a critical decision as Suffolk County’s water quality regulations continue to evolve. Since July 1, 2019, Suffolk County Department of Health Services implemented changes requiring that failing cesspools must be replaced with new systems rather than like-for-like replacements. Understanding your conversion timeline is essential for proper planning and budgeting.
Current Regulatory Landscape for Huntington Residents
Suffolk County Legislature passed new changes in October 2020 that require septic improvement and innovative treatment systems, effective July 1, 2021. As of July 1, 2021, Article 6 requires the new systems to be installed for all new construction, while existing homeowners have more flexibility in their timing.
The use of cesspools in new construction has been banned since 1973, and they cannot be used as replacements for old ones. Homeowners are not required to replace their current systems, but if they decide to do so, the new systems must meet the same standards as those established in 1973.
Understanding Advanced Treatment Systems
These new systems use advanced technology to treat wastewater and reduce the amount of nitrogen that enters the groundwater, ultimately protecting the environment and public health. The ban will advance water quality efforts and set the stage for the use of new technologies that reduce nitrogen in residential wastewater by up to 70%.
The Suffolk County Wastewater Plan, adopted in July 2020, estimated that there are 365,000 residential onsite sewage disposal systems installed in Suffolk County, of which 252,530 are estimated to consist of cesspools only. This massive number underscores the importance of proper planning for conversions.
Planning Your Conversion Timeline
For Huntington residents considering a conversion, the timeline depends on several key factors:
- System Assessment: The EPA strongly recommends that a cesspool or septic system should be inspected at least every two to three years, with mechanical pumping typically needed every three to five years to drain the tank
- Permit Processing: Replacement of existing cesspools and septic systems will require registration of the new system with the Department of Health Services
- Installation Timeline: Professional installation typically takes 3-5 days, depending on soil conditions and system complexity
Financial Planning and Available Assistance
These new high-tech septic systems will cost about $17,000 — double that of the old cesspools. However, significant financial assistance is available. Starting January 22, 2019 Suffolk County residents may be eligible for combined State and County grants of up to $30,000 to install an Innovative and Alternative nitrogen removal septic system.
The Suffolk County Septic Improvement Program provides up to $10,000 base grant. There is also up to an additional $10,000 that can be awarded to a grantee that installs a pressurized shallow drain field leaching system ($5,000) and/or toward the unit installation for low to moderate incomes eligible applicants ($5,000).
Choosing the Right Service Provider
When planning your cesspool huntington conversion, selecting an experienced local contractor is crucial. Since its birth as a family-run business, EZ Cesspool has serviced the local, neighboring communities in both Huntington and Greenlawn. After years of dedication and acquired credibility within the industry, EZ Cesspool eventually expanded its clientele base by providing to both Nassau and Suffolk Counties Cesspool repair and septic services.
Our belief is that no job is ever too large or small, which is why we offer reasonable, competitive prices and DO NOT sub-contract any work. Further, we provide a 24/7 emergency service for septic systems, which is both prompt and reliable.
Key Timeline Considerations
Several factors can impact your conversion timeline:
- Seasonal Considerations: Nassau County’s seasonal weather adds excessive strain on cesspools; this is why professional cesspool pumping becomes even more critical
- Soil Conditions: Long Island’s sandy soil and seasonal water table changes create specific challenges for septic systems
- System Size: A typical four-bedroom house in Huntington, NY will have an approximately 1,200 to 1,500 gallon tank. A family of four to six should expect the need to have the cesspool or septic system pumped, on average, every 3 to 5 years with normal use
The EZ Cesspool Advantage
We are the professionals when it comes to septic tank service and installation. We understand that you need your system to function properly and for many years to come, so we make sure each step of the process is done with precision and care.
We believe in transparency. You’ll always know the cost upfront. This commitment to honest pricing helps homeowners plan their conversion timeline without unexpected financial surprises.
Moving Forward with Your Conversion
The transition to advanced treatment systems represents a significant investment in Long Island’s environmental future. Homeowners can play a significant role in protecting the quality of Long Island surface and ground water by installing advanced wastewater treatment systems that reduce nitrogen pollution.
Planning your Huntington cesspool conversion timeline requires careful consideration of regulatory requirements, financial assistance programs, and seasonal factors. By working with experienced professionals and taking advantage of available grants, homeowners can make this transition more manageable while contributing to the long-term health of our local waterways.
Whether you’re facing an immediate system failure or planning a proactive upgrade, understanding these timelines and requirements will help ensure your conversion project proceeds smoothly and efficiently.